Included tools active2,400 tokens
Demand1134.54 kVA
Short Circuit34.918 MVA
Transformer113.45%
Annual Loss$4,741.86
Electrical Study
One-lines, arc flash planning, load flow, short circuit, sizing, and demand load reports.
| Circuit | From | To | V | kVA | Len | Size | OCPD | FLA | VD% | Fault | Status |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 971.27 | 0.366 | 38.01 | Upsize conductor or add parallel runs | ||||||||
| 259.81 | 0.749 | 22.47 | Upsize conductor or add parallel runs | ||||||||
| 163.88 | 1.585 | 8.9 | Upsize conductor or add parallel runs | ||||||||
| 62.55 | 0.606 | 8.6 | OK |
One-Line
Generated from circuit data and ready for CAD/Revit exchange JSON.
Review Queue
High-signal engineering items before model sync.
- HighTransformer
Transformer loading is 113.5%.
- HighSWBD-MDP
Upsize conductor or add parallel runs
- HighMDP-MCC1
Upsize conductor or add parallel runs
- HighMDP-LP1
Upsize conductor or add parallel runs
- InfoEngineering seal
Automated calculations are preliminary until reviewed by a licensed engineer.